03 Jul Opportunity Alert
An EBCC member company from Egypt has prequalified for the EPC onshore expansion pipelines of the Liverpool Bay Carbon Capture and Sequestration Project
They have now received an invite to submit the technical and commercial offers. The deadline for packages 1 and 2 is July 22nd and that for package 3 is Aug 22nd.
Deadline – Tuesday 8th July
(By registering interest, your details will be shared with the EPC contractor)
Required Subcontractors / Consultants
Licenses and Permits Provider / Trenchless crossings include Weaver river crossing. / Logistics Provider. / Hiring of labours and equipment. / Camp construction. / Temporary site facilities construction. / Inland transportation of pipes, material and Equipment. / Laying and splicing of electrical, telecommunication and instrumentation cables. / Insurance company. / Concrete work. Environmental impact study. / Topographic survey, geotechnical survey, underground scanning and hydrological survey. / Engineering consultant includes HAZOP stud and QRA . / Cathodic protection system and deep wells. / None destructive tests. / Baseline survey. / Trenching excavation, embankments and soil stabilization. / Sand padding around pipelines and cables. / Sandblasting and coating of field joints girth welds. / Supply and installation of steel fences and gates. / Access Platforms, Cross-overs, Gratings, Stairs, Ladders and Handrails. / HVAC supply and installation.
No Comments